Our dues have exploded. Our building experience hasn’t kept up.
The 2027 budget passed November 18, 2026: +9.8%, with a smaller reserve contribution. The Associa record → Key issues →
Associa: what owners have paid, and what the record shows
Manager turnover. Karla (November 2023). Regina, community association manager, and Ann, resident onsite manager (February to August 2024). Jennifer (September 2025 to July 2026). Mike (September 2026). The maintenance tech was replaced in March 2026.
Assessments before and after Associa
Associa took over in late 2022. The board approved the Associa management agreement by email vote between August and October 2022, and 2023 was the first budget under Associa. Compare the two eras:
| Period | Assessments | Total change | Per year, compounded |
|---|---|---|---|
| 2018 to 2022, before Associa | $701,768 to $853,608 | +21.6% | about 5.0% |
| 2022 to 2027, under Associa | $853,608 to $1,285,603 | +50.6% | about 8.6% |
| 2023 to 2027, since the first Associa budget | $966,941 to $1,285,603 | +33.0% | about 7.4% |
2018 and 2022 are budget figures, 2023 to 2025 actuals, and 2026 and 2027 budgets, so the bases are mixed. Insurance, utilities and wages also rose. Associa’s share of the increase hasn’t been disclosed. Source: the budget history on the Budget tab; Board Meeting Agenda, October 12, 2022.
From the board minutes:
| When | What the minutes say |
|---|---|
| Nov 2023 | Karla (Associa) is the manager at the budget ratification meeting. |
| Feb to Aug 2024 | Regina is the community association manager. Ann is the resident onsite manager through June 2024. |
| Sep 2025 | The elevator contractor, Kone, is “not performing contract maintenance.” |
| Sep 2025 | For the 2026 budget, a number of categories (security, salaries and management fees) are left without amounts because “Associa [is] not providing the information.” The 2025-2026 management contract arrives on September 24, a week before its October 1 renewal date. |
| Sep 2025 to Jul 2026 | Jennifer is the Associa manager named in the minutes from September 2025 through July 2026. |
| Nov 2025 | Associa is billing the maintenance tech incorrectly: $25 travel and fuel fees that should not apply, at a rate that should be $70 an hour. The board records “several dissatisfied comments” about the tech’s work. A renewal contract with a 12% charge on salaries is under discussion. |
| Dec 2025 | The board authorizes up to $40,000 to move from reserves to operating on a one-time basis, to be repaid monthly. |
| Mar 2026 | The maintenance tech is reassigned. Most of the agenda is tabled, including owner requests and the open forum. |
| Mar 2026 | Management reports move to Town Square instead of going to board members. January and February financials are unreconciled and not ready for a vote. |
| Sep 2026 | The treasurer warns of cash flow concerns for the rest of the year because of the increase in General Maintenance and “Payroll for Manager.” |
| Sep 2026 | Mike, General Manager, and Tyleen, VP of Management, attend. Mike prepared the minutes. |
Sources: Watermark board minutes of November 15, 2023, February 14, April 10, June 12 and August 14, 2024, September 4, September 24, November 6 and December 4, 2025, and March 12, July 2 and September 3, 2026. Entries are quoted or paraphrased from the minutes; the minutes were prepared by the Association, and some are incomplete.
A building about the same age, with a different manager
Ajax Lofts, 2955 Inca Street, is a 50-unit building from 2001. Recent listings show dues of $309 a month for a 1,048 sq ft home and $443 a month for a 1,496 sq ft home, both about 30¢ per square foot per month. In the 1,496 sq ft listing, dues include insurance, structure and grounds maintenance, water, sewer, trash and snow removal. The Watermark’s 2027 assessments work out to about 84¢ per square foot per month ($1,285,603 across 127,063 sq ft).
Sources: Compass listing, Unit 3A; BHGRE listing, Unit 3K; building profile. Ajax Lofts is smaller and has different amenities and staffing, so this is not a like-for-like comparison. One real-estate site lists Colorado Property Management Group as its manager; that is unconfirmed.
An alternative to ask for a proposal
Family-owned since 1979. By its own account it manages 98 communities and about 15,000 doors in the Denver area. Each community gets a Community Association Manager plus an assistant manager, in-house accounting, vendor and capital project management, and a board portal with live bank balances. (303) 733-1121. Pricing is not published. Source: ACCU press release, October 27, 2026.
The markup on our staff
The November 6, 2025 minutes record the board accepting Associa’s renewal contract pending a discussion of “a 12% charge on salaries only.” The markup is estimated at 12–14% on supplied labor, about $40,000 a year. The full contract and fee schedule have not been published to owners.
Option: employ staff directly
Run payroll, benefits and tax filings on a flat per-employee platform such as Gusto. Keep a management company for accounting, collections and compliance only. Check the management agreement for notice terms and the actual markup first. How it works →
Paying our staff directly with Gusto
Today our staff are supplied through Associa, which charges an estimated 12–14% markup on labor, about $40,000 a year. The alternative: the Association becomes the employer and runs payroll on Gusto, a payroll and HR platform with a major office in downtown Denver, near Union Station.
Published plan prices: Simple $49 + $6 per person, Plus $80 + $12, Premium $180 + $22 a month (Fit Small Business, Sept 2025). Confirm current pricing with Gusto. Five employees is an example, not the building’s actual headcount.
What Gusto handles
Direct deposit every pay period. Pay stubs and W-2s for each employee.
Calculates, files and pays Social Security, Medicare, federal withholding and federal unemployment each payroll.
State withholding, state unemployment, and Colorado FAMLI premiums.
Denver charges $5.75 a month per employee and $4 a month per employer. Confirm with Gusto that Denver OPT is filed for the Association.
Agency letters about filings Gusto made. Confirm with Gusto what it resolves on the Association’s behalf.
Health insurance, 401(k) and pay-as-you-go workers’ comp, set up inside the same account.
Review cycles and records for each employee, included on the Plus and Premium plans.
Time tracking and paid-time-off balances that flow into payroll.
Sources: Gusto payroll; Gusto, Hiring employees in Colorado (Denver OPT rates, FAMLI, unemployment); Fit Small Business review.
What the Association needs to do
- Read the Associa contract. Notice period, staffing terms, and the actual markup.
- Register as an employer. Colorado unemployment and withholding accounts, FAMLI, and Denver OPT. Gusto can help with state registration.
- Insurance. Workers’ comp, and employment practices liability added to the Association’s policy.
- Written policies. A short employee handbook and one board member named as the HR contact.
- Offer staff the same or better pay, plus health coverage and a 401(k), and move them over on a set date.
Colorado figures for planning: new-employer unemployment rate 3.05% on a $30,600 wage base; FAMLI employer premium 0.9% for 10 or more employees, otherwise remit the 0.45% employee share (Gusto, Hiring employees in Colorado).
Traction: Level 10 meetings
Framework: the Entrepreneurial Operating System (EOS), from Gino Wickman’s Traction. Core tool: the Level 10 Meeting (EOS Worldwide), 90 minutes, same agenda every time.
| Segment | Time | What happens |
|---|---|---|
| Segue | 5 min | Each person shares good news from the past week. |
| Scorecard | 5 min | 5 to 15 key numbers, each marked on track or off track. Off-track items go to the issues list. |
| Rocks | 5 min | Quarterly priorities, each with one owner, marked on track or off track. |
| Headlines | 5 min | Customer and employee news, good or bad. Problems move to the issues list. |
| To-dos | 5 min | Last week’s action items, done or not done. |
| IDS | 60 min | Identify, Discuss, Solve. Rank the top three issues and solve them for good, in order. |
| Conclude | 5 min | Recap the new to-dos, decide what to communicate, and rate the meeting. |
Source: EOS Worldwide, “The Level 10 Meeting.” EOS runs the meeting weekly with the same facilitator and scribe, starting and ending on time. A volunteer board would likely meet less often, so the cadence would need adapting.
For the Association: scorecard = open maintenance requests, cash vs. budget, reserve balance. Rocks = unfinished projects.
The building
The Watermark was established as a condominium community in November 2007 (recorded under the name Watermark Village) and is governed by the Amended and Restated Declaration recorded in 2020. It sits inside a Denver Landmark Preservation district, so exterior changes go through the city as well as the Association. Homes range from one-level residences on the lower floors to two-level penthouses on the seventh floor.
Residences per floor, from Exhibit A of the Declaration. Bar length shows how many homes are on each floor; the size of the largest home on that floor is noted.
Amenities
- Sky GardenSeventh-floor rooftop with city views, grill, and lounge; reservable for private events
- Heated pool and hot tubOn the Sky Garden, open year-round, 5 a.m. to midnight
- Fitness roomSeventh floor, 6 a.m. to 11 p.m.; free weights, treadmills, bikes, machines
- Kitchenette and meeting roomSeventh floor, reservable for gatherings of up to 15
- LobbyCoffee, tea, and hot chocolate around the clock, and a community library
- Concierge and securityStaffed concierge seven days a week; on-site security overnight, every night
- Secured garageAssigned parking, bicycle cage, and storage
- Package deliveryPackages brought to your door by the concierge; dry-cleaning pickup in the mailroom
This site is published by an owner, not by Watermark Condominium Association, Inc. Official notices, records requests, and management contact go through Colorado Association Services, the Association's managing agent.
How the building is governed
The Association is a Colorado nonprofit run by a five-member board of owners serving three-year terms. Every unit's vote is weighted by its share of the building, from 0.60% for the smallest home to 2.97% for the largest. Assessments are allocated the same way.
- Budget. The board adopts a budget each year. It takes effect unless owners holding 51% of the total vote reject it at the budget meeting.
- Board meetings. Open to all owners, held at least quarterly, with an agenda available in advance. Closed sessions are limited by statute to a short list of topics.
- Records. Owners can inspect Association records under Colorado law and the Bylaws. Financial statements, minutes, insurance, and policies must be made available within 90 days of year-end.
Declaration recorded March 12, 2020, Reception No. 2020036227; Amended and Restated Bylaws adopted March 6, 2020.
Nine years of assessments
Assessments: +83% since 2018, +33% since 2023. The biggest step was 2023, the first Associa budget. 2027’s +9.8% is the largest since.
budget actual 2027 approved. Years 2019 through 2021 are not yet in the archive.
| Year | Basis | Assessments | Change |
|---|---|---|---|
| 2018 | Budget | $701,768 | |
| 2022 | Budget | $853,608 | +21.6% |
| 2023 | Actual | $966,941 | +13.3% |
| 2024 | Actual | $1,028,235 | +6.3% |
| 2025 | Actual | $1,081,842 | +5.2% |
| 2026 | Budget | $1,170,896 | +8.2% |
| 2027 | Approved | $1,285,603 | +9.8% |
2018: Watermark 2018 Financials. 2022: 2023 Annual Budget. 2023 to 2025 actuals, 2026 budget, 2027 approved: "2027 Budget D — Approved," October 1, 2026. The 2022 figure is a budget and the 2023 figure an actual, so that one step mixes bases.
2018 to 2027 works out to about 7% a year, compounded.
The budget, this year and next
Every owner pays a share of this, weighted by unit size. The 2026 budget is what we're paying now. The 2027 column is the budget that passed, "2027 Budget D — Approved," dated October 1, 2026. It passed at the budget meeting on November 18, 2026, so it takes effect for 2027.
2026 budget 2027 approved
| Category | 2026 | 2027 | Change |
|---|---|---|---|
| Reserve contribution | $290,400 | $250,000 | −14% |
| Payroll and benefits | $157,000 | $298,920 | +90% |
| Utilities | $241,792 | $255,973 | +6% |
| Contracted services (janitorial, trash, HVAC, fire) | $134,589 | $151,978 | +13% |
| Repair and maintenance | $167,996 | $123,150 | −27% |
| Security and concierge | $82,567 | $85,900 | +4% |
| Insurance | $65,000 | $68,300 | +5% |
| Elevator | $38,275 | $41,950 | +10% |
| Administrative and management | $34,624 | $35,250 | +2% |
| Professional services (audit, legal, engineering) | $18,500 | $32,000 | +73% |
| Landscaping | $9,500 | $19,500 | +105% |
| Communications | $16,000 | $11,700 | −27% |
| Operations | $2,000 | $6,729 | +236% |
| Total operating expense | $1,258,243 | $1,381,350 | +10% |
Total expense rises 9.8%. Take out the reserve contribution and the rest of the budget rises 16.9%, from about $968,000 to $1,131,000.
Legal and professional fees up 73%. $18,500 to $32,000. The audit drops from $2,500 to $500, so legal and engineering rise about $15,500. Legal was $6,758 in 2023 and $12,132 in 2025 (+80%). The 2027 legal amount isn’t broken out. Questions →
| Income | 2026 | 2027 | Change |
|---|---|---|---|
| Owner assessments | $1,170,896 | $1,285,603 | +10% |
| Other income (rooftop lease, fees, contributions) | $87,347 | $95,747 | +10% |
| Total operating income | $1,258,243 | $1,381,350 | +10% |
Source: "2027 Budget D — Approved," October 1, 2026. Other income combines Mansion HOA dues, EV chargeback, initial contributions, user fees, and the cell-site lease.
The cell tower on our roof
Since 2015 the Association has been landlord to an AT&T cell site. It brings in about $37,000 a year, which is roughly 2.9% of everything owners pay in assessments. It also comes with a contract that binds the building for up to thirty years.
What's up there
Twelve antennas in three groups, mounted on the penthouse walls and behind a fiberglass enclosure on the roof, all painted to match the building. A 30-by-9-foot equipment area on the rooftop. Cable trays running along the screen wall. The exhibit to the lease describes the antennas as concealed and textured to match the existing building.
The tenant is New Cingular Wireless PCS, LLC, doing business as AT&T. The site is designated COU5231, "Speer and Broadway." The Association signed as landlord on January 27, 2015. AT&T signed February 18, 2015. A Memorandum of Lease was prepared for recording against the property.
How long we're in this
The lease runs in stages, and every stage renews on its own unless AT&T says otherwise:
- Initial term: ten years from the date AT&T exercised its option and started construction.
- Four automatic five-year extensions after that, on the same terms, unless AT&T gives sixty days' notice that it won't renew. That's thirty years total.
- Then year-to-year, until either side gives six months' notice.
"This Agreement will automatically renew for four (4) additional five (5) year term(s)... upon the same terms and conditions unless Tenant notifies Landlord in writing of Tenant's intention not to renew this Agreement at least sixty (60) days prior to the expiration of the existing Initial Term or then-existing Extension Term." Section 3(b)
The renewals are AT&T's to decline, not ours. The Association has no right to end the lease during the initial term or any extension except for AT&T's own default. AT&T, on the other hand, can leave on sixty days' notice at any time by paying three months' rent (Section 6(e)).
The rent, and the 4% that's written in
Base rent started at $24,000 a year. Section 4(b) sets what happens after that:
"Beginning with year two (2) of the initial term, and each year thereafter, the monthly rent will be increased by four percent (4%) over the previous year's rent." Section 4(b)
The lease sets this, not the board.
Run the clause forward from $24,000 and it reproduces the 2018 figure exactly if rent began in 2016. Here is that formula next to what the budgets show:
| Year | Lease formula | Budget or actual |
|---|---|---|
| 2018 | $25,958 | $25,958 |
| 2022 | $30,368 | $30,263 |
| 2023 | $31,582 | $30,418 actual |
| 2024 | $32,846 | $43,057 actual |
| 2025 | $34,159 | $36,678 actual |
| 2026 | $35,526 | $36,947 budget |
| 2027 | $36,947 | $36,947 budget |
Sources: lease Section 4(b); 2018 Financials; 2023 Annual Budget; 2027 Budget D. The formula is an approximation, because rent steps up on the lease anniversary, not on January 1, and it assumes the first rent year was 2016.
The 2027 budget figure matches what the lease produces. The earlier years sit a few thousand dollars either side, which is what timing looks like. The one that stands out is 2024: $43,057 recorded, about $10,000 above the formula. That could be back rent collected or something else. Management can say which.
So the numbers don't show the escalator being missed. They show a rent line that has moved around, and one year that needs an explanation. The rent schedule and the commencement date settle it.
Who pays for the equipment's electricity
Cell equipment runs 24 hours a day. The lease is direct about who pays for that:
"Tenant will be responsible for paying on a monthly or quarterly basis all utilities charges for electricity, telephone service or any other utility used or consumed by Tenant on the Premises. In the event Tenant cannot secure its own metered electrical supply, Tenant will have the right, at its own cost and expense, to submeter from Landlord... Landlord agrees that it will not include a markup on the utility charges." Section 14(b)
Two things follow. AT&T pays for its own power, at cost. And if AT&T is on the building's meter rather than its own, the Association is supposed to read the submeter monthly and invoice it.
The 2023 budget planned $6,000 in AT&T electricity reimbursement ($5,400 the year before). Actual: $0 in 2023, 2024 and 2025. 2027 budget: $14,000. Either AT&T has its own meter, or the Association stopped invoicing.
There's a deadline attached to the answer. Section 4(c) says utility charges the Association doesn't bill within a year of the end of the calendar year they were incurred "shall not be billed by Landlord, and shall not be payable by Tenant." Whatever wasn't invoiced for 2024 is already gone. 2025 has until the end of this year.
What the Association agreed to
Other obligations on the Association:
- Access, around the clock. AT&T gets 24/7 access for emergencies and business-hours access for routine work. If the Association blocks access, it owes $120 a day in liquidated damages until it's fixed (Section 12).
- No interference. The Association won't lease roof space to any other wireless carrier if it would interfere with AT&T, and must stop any interference within 24 hours of notice (Sections 8 and 22(c)).
- No zoning changes. The Association won't seek or consent to any zoning change or use restriction that would limit AT&T's use of the site (Section 1(g)).
- AT&T can modify at will. The tenant may "modify, supplement, replace, upgrade, expand the equipment, increase the number of antennas or relocate the Communication Facility at any time during the term" (Section 2). The Association's consent isn't required.
- Loser pays. In any dispute under the lease, the prevailing party recovers its attorneys' fees (Section 24(m)).
The Association can’t make AT&T move or remove its equipment. See Sections 2, 8 and 24(m) before spending on relocation.
If the antennas move, the rent has to move with them
Moving the antennas from the north penthouse wall to the roof has been discussed. Two lease terms govern it.
More square feet means more rent, by contract
The lease covers a specific 300 square feet. If AT&T's equipment needs more space than that for any reason, including a relocation, Section 2 says what happens:
"In the event Tenant desires to modify or upgrade the Communication Facility, in a manner that requires an additional portion of the Property (the 'Additional Premises') for such modification or upgrade, Landlord agrees to lease to Tenant the Additional Premises, upon the same terms and conditions set forth herein, except that the Rent shall increase, in conjunction with the lease of the Additional Premises by the amount equivalent to the then-current per square foot rental rate charged by Landlord to Tenant times the square footage of the Additional Premises." Section 2
$36,947 for 300 square feet is about $123 per square foot per year. A 450 sq ft rooftop layout would add about $18,000 a year, escalating 4% annually. Any relocation needs a footprint survey and matching rent adjustment.
The building should not pay to move AT&T's equipment
The equipment is AT&T’s property (Section 13). AT&T can relocate at its own expense (Section 2). The Association can’t require a move and has no obligation to fund one.
A relocation requested by a few owners isn’t a common expense. Declaration Section 5.5(c): an expense benefiting fewer than all units “may be assessed equitably against those Units benefited.”
Five questions for management
- What is the rent schedule? Provide the rent commencement date, the current schedule under Section 4(b), the payment history for 2024 to 2026, and what the $43,057 recorded in 2024 was.
- Whose meter is AT&T on? Its own, or the building's? If the building's, when did the Association last read the submeter and invoice it?
- Where do AT&T's notices go? The lease lists the Landlord's notice address as "c/o Ms. Agatha Kessler" at the building, with a copy to her office. Section 17 lets the Association change that with thirty days' written notice. Has it?
- Where is the recorded Memorandum? The lease calls for a Memorandum of Lease to be recorded. Provide the reception number.
- What's the footprint of any proposed relocation? If antennas move to the roof, provide the square footage of the new premises and the rent adjustment under Section 2 before any owner money is discussed.
The lease, the 2018 budget, and the 2023 budget are Association records.
EV charging: what Colorado law lets the Association bill
Owners who charge an electric vehicle in the garage can be billed for the electricity. Colorado's condominium act sets the rule, and the Association's Xcel invoice supplies the numbers.
What the statute says
C.R.S. 38-33.3-106.8 protects an owner's right to install and use an EV charging station. The Association may require the owner to reimburse it for the “actual cost of electricity” the charger uses, or charge a reasonable fee for access to the station.
Colorado Association Services has proposed collecting from January 1, 2027, with charges waived until then. Its draft policy offers options that include the demand charge and options that leave it out.
The board adopted 10¢ per kWh on October 28, 2026. That number isn't an Xcel rate and doesn't come from any Xcel invoice. Worked from the invoice below, the cost of a kilowatt-hour including taxes is about 4.4¢, so 10¢ is more than double. For 200 kWh that is $20.00 against $8.74. Statute allows the “actual cost of electricity.” Ask the board what the 10¢ is based on.
How to read the Xcel invoice
The building has three Xcel meters: the Fire Pump (1982), the Mechanical Room (2014), and the Residential meter (2016). The garage chargers sit on the residential meter. Four kinds of lines show up on it, and only some of them have anything to do with how many kilowatt-hours a car pulled.
What you actually used. Billed at the Secondary General rate per kWh, plus the Electric Commodity Adjustment (ECA). This is the cost of the electricity itself.
The highest 15-minute burst of power in the month, not total use. Xcel takes the kWh used in that interval and divides by 0.25: 20 kWh in 15 minutes is 80 kW. It bills the maximum as Demand Actual, then Billable Demand in full-kW steps.
Customer and service charges and riders. They're the same whether one car charges or none.
A 3% franchise fee and state and local sales tax, applied to the charges above. They are percentages, so they move with the charges they sit on.
The ECA resets quarterly. Use the rates on the invoice you’re checking.
The formula
For energy only, which is the cost of the electricity a charger uses:
Cost = kWh × (Secondary General rate + ECA rate) × 1.12423 1.12423 = 1 + 3% franchise fee + 9.423% sales tax, for the invoice used below
Worked example for 200 kWh of charging, using the building's residential-meter invoice:
- Add the two per-kWh rates. Secondary General $0.008530 plus ECA $0.030320 is $0.03885 per kWh. Check it against the invoice: $350.70 plus $1,246.58 is $1,597.28, divided by 41,114 kWh, is $0.03885.
- Multiply by the kWh used. 200 × $0.03885 = $7.77.
- Add the taxes, each on the $7.77. Franchise fee at 3% is $0.23. Sales tax at 9.423% is $0.73. They don't stack on each other. Combined, 12.423%, that's $0.97. The sales tax rate comes off the invoice: $488.99 of tax on $5,189.34 of taxable charges is 9.423%.
- Add it up. $7.77 plus $0.97 is $8.74 for 200 kWh, about 4.37¢ per kWh.
| Step | Amount |
|---|---|
| Energy: 200 kWh × $0.03885 | $7.77 |
| Franchise fee, 3% | $0.23 |
| Sales tax, 9.423% | $0.73 |
| Cost of 200 kWh | $8.74 |
Rates and totals are from a Watermark residential-meter Xcel invoice. Each quarter, re-derive the sales tax as the invoice's tax divided by its taxable amount, and use that quarter's Secondary General and ECA rates.
Where each cent of a kilowatt-hour goes
Split into the pieces Xcel actually bills, a kilowatt-hour costs the Association about 4.37¢. The board's 10¢ is more than twice that.
| Piece, per kWh | Cents |
|---|---|
| Secondary General energy rate | 0.853¢ |
| Electric Commodity Adjustment (ECA) | 3.032¢ |
| kWh lines only (the two rates added) | 3.885¢ |
| Franchise fee, 3% | 0.117¢ |
| Sales tax, 9.423% | 0.366¢ |
| Cost of a kWh with taxes | 4.37¢ |
| Board's adopted rate | 10.00¢ |
| Part of the 10¢ not tied to any Xcel line | 5.63¢ |
Rates are from a Watermark residential-meter Xcel invoice. ECA resets every quarter, so the split moves with each new invoice.
How much power is an EV, really?
The electricity an EV uses in a month is in the same range as a computer that never sleeps.
| Load | kWh a month | At 4.37¢ | At 10¢ |
|---|---|---|---|
| EV driven 1,000 miles (0.3 kWh a mile) | 300 | $13.11 | $30.00 |
| High-end workstation, 600 W around the clock | 438 | $19.14 | $43.80 |
| Gaming PC, 500 W, 6 hours a day | 90 | $3.93 | $9.00 |
Estimates, not measurements. A month is 730 hours. 4.37¢ is the cost per kWh with taxes from the invoice formula above. Real EVs vary from about 0.25 to 0.35 kWh a mile, and a computer's draw depends on what it's doing.
The risk in a rate with no data behind it
200 kWh a month at 10¢ is $20.00 vs. $8.74 at invoice cost: $11.26 over, per charging owner, per month. The prevailing party in an action to enforce CCIOA recovers attorney fees (C.R.S. 38-33.3-123(1)(c)). Not legal advice.
Where owners and management differ
Energy only
The owner reimburses the kWh used, plus taxes, per the formula above. Demand and fixed charges are building load and appear with or without chargers. A flat $15–$25 monthly fee is also allowed by statute.
Every line on the meter
Management's reading is that actual cost means all the electricity lines on the residential meter, including demand. Under it, owners are billed a share of the total, and the demand charge can make a month's charging cost far more per kWh than the energy rate above.
The statute doesn’t define “actual cost.” Any charge above the energy rate should name the invoice lines and show the charger caused them.
What to ask for
- The method in writing, with the formula, before the first bill goes out.
- Which invoice lines are included, and how each is allocated among owners who charge.
- How charger use is measured: a submeter reading, or an estimate.
- Confirmation that charges are waived through December 31, 2026, as proposed.
Read the law yourself
- Colorado Common Interest Ownership Act (CCIOA), full text, 2026, from the Colorado Division of Real Estate
- C.R.S. 38-33.3-106.8, EV charging systems in associations
- C.R.S. 38-33.3-123, enforcement and attorney fees
- Everything You Need to Know About EV Charging Systems, Altitude Community Law (a Colorado HOA law firm's explainer)
What dues do to home values
The math
Lenders count HOA dues in a buyer's monthly obligations. Every additional $100 a month in dues cuts a buyer's borrowing capacity by roughly $14,600, assuming a 30-year mortgage at 7.32% and a buyer at their lender's debt-to-income limit. A $300 increase means about $43,700 less purchasing power on a $500,000 condo.
| Additional monthly dues | Less borrowing capacity | % of $500,000 home | % of $600,000 home |
|---|---|---|---|
| $100 | $14,600 | 2.9% | 2.4% |
| $200 | $29,100 | 5.8% | 4.9% |
| $300 | $43,700 | 8.7% | 7.3% |
| $500 | $72,800 | 14.6% | 12.1% |
| $1,000 | $145,600 | 29.1% | 24.3% |
Assumes a 30-year mortgage at 7.32%, the Freddie Mac weekly average for October 22, 2026, and a buyer at their lender's debt-to-income limit. The dollar reduction is the same at either home price.
Effect on every owner: higher dues shrink the pool of qualified buyers. Sales ↓
Where to look for savings
The estimated Associa markup on labor is 12–14%, about $40,000 a year. Associa →
What our homes are selling for
Recent Watermark sales vs. earlier ones, from public records.
| Home | Earlier sale | Recent sale | Change |
|---|---|---|---|
| Unit 414, 1,301 sq ft Same home, sold twice | $625,000 Dec 2022 | $580,000 Sep 2024 | −7.2% |
| Unit 609, 1,201 sq ft vs. Unit 409, 1,202 sq ft | $577,000 Feb 2022 | $482,000 Jul 2026 | −16.5% |
| Unit 610, 1,196 sq ft vs. Unit 409, 1,202 sq ft | $577,000 Feb 2022 | $555,000 Sep 2026 | −3.8% |
| Unit 411, 1,457 sq ft Same home, sold twice | $635,000 Mar 2021 | $650,000 Jul 2023 | +2.4% |
| Unit 208, 1,668 sq ft No earlier sale on record | — | $573,000 Jan 2026 | — |
Sources: Redfin sale histories for #414 and #409, and recent building sales listed there; #610 listing history. Rows two and three compare different homes of nearly the same size, not the same home. #411 and #208: Redfin.
Unit 414 came on at $639,000 in February 2024 and took six price cuts over six months to sell at $580,000. Unit 610 listed at $599,000 in July and sold at $555,000 in September.
For sale now
| Home | Sq ft | List price | Per sq ft |
|---|---|---|---|
| Unit 206 | 1,714 | $574,900 | $335 |
| Unit 211 | 1,431 | $574,900 | $402 |
| Unit 305 | 1,133 | $545,000 | $481 |
| Unit 321 | 945 | $439,000 | $465 |
| 418 Acoma St | 1,844 | $749,999 | $407 |
As of November 19, 2026, from the building listing table on Redfin and Homes.com. Redfin groups 418 Acoma St with the building. List prices, not sale prices. Listings show $722 to $1,278 a month in dues across the building.
Key issues for owners
The pattern: assessments +33% since 2023, +83% since 2018, with five Associa managers since November 2023. The Associa record →
Assessments are up 33% since 2023. The 2027 budget adds another 9.8%. Budget →
$290,400 to $250,000 (−14%). Without the cut, the increase would be about 13%. Budget →
Everything except reserves: about $968,000 to $1.13 million. Budget →
$157,000 to $298,920 (+90%), including a new $101,920 maintenance salary line. Building Repair and Maintenance drops from $60,000 to $15,000. Budget →
Hallway walls with holes where the art came down. The entry. Fall landscaping. Questions →
The board’s rate versus the cost on the Xcel invoice, and what the statute allows. EV charging →
An estimated 12–14% on supplied labor, about $40,000 a year. Associa →
Up 73% to $32,000, while the audit line is cut from $2,500 to $500. Legal alone rose 80% from 2023 to 2025. No one has said which matters drive it. Budget →
The lease says AT&T pays for its own power at cost. The books show $0 reimbursed in 2023, 2024 and 2025. Anything not billed within a year of year-end is lost. Cell Tower →
Recent Watermark sales are below earlier ones, and every $100 a month in dues cuts a buyer's borrowing power by about $14,600. Value →
Five managers since November 2023. Associa →
Executive sessions, 2022 email votes, committees, the reserve study and the annual disclosures are all unanswered. Most questions remain open. Questions →
What owners can do: submit questions in writing, request the records, attend board meetings.
Proposed cost savings
Remove the estimated Associa markup on supplied labor. Associa →
Set a written annual legal budget, require the board to report which matters are open and who they are for, and use the lowest-cost route first (a demand letter before litigation).
Landscaping doubles (+$10,000) and Operations rises 236% (+$4,729). Ask for the scope behind each before the money is spent.
The $141,920 increase needs a published staffing plan and proof it costs less than the contractors it replaces.
Contracted services ($151,978) are the largest operating line after payroll and utilities. Rebid janitorial, trash, HVAC and fire contracts, and get competing insurance quotes at renewal. Savings unknown until bids arrive.
The SCRAPS compost program costs $2,500 a year. Ask how many units use it.
Source: “2027 Budget D — Approved.” The markup is an estimate.
Details
Residences, amenities, and how the Association is governed.
The AT&T rooftop lease: term, rent, electricity, relocation.
The statute, the Xcel invoice, and the cost of a kWh.
More questions
Was the maintenance-tech overbilling ($25 travel and fuel fees) credited back? How much?
OpenAssociaSource: Board minutes, Nov 6 2025Is the smaller reserve contribution a one-year measure? What is the plan for 2028?
OpenBudgetSource: 2027 Budget DWhich matters drove $12,132 in legal spending in 2025, and what is budgeted for legal in 2027?
OpenBudgetSource: 2027 Budget DThe audit drops from $2,500 to $500. Who reviews the 2026 books, and when will owners get the report?
OpenBudgetSource: 2027 Budget D; Bylaws Section 10.2(b)Water was cut while two new sewer lines add $23,340. What is the combined water and sewer increase?
OpenBudgetSource: 2027 Budget DWhat is the 10¢ per kWh based on? Provide the worksheet and the Xcel invoice lines used.
OpenEV chargingSource: Board decision, Oct 28 2026; C.R.S. 38-33.3-106.8Will the billing method be in writing, with the formula and how use is measured, before the first bill?
OpenEV chargingSource: Draft EV policyIs AT&T on its own Xcel meter or the building’s? If the building’s, has 2025 electricity been invoiced before December 31, 2026?
OpenCell towerSource: AT&T lease Sections 4(c) and 14(b)Were the fiscal 2025 disclosures made available to owners by March 31, 2026?